EV Chargers
Jingye New Energy provides a full range of DC fast EV chargers built to the same quality standards behind our energy storage systems and validated in our CNAS-accredited testing laboratory. From mid-power destination charging to high-power public stations, our chargers are engineered for reliable, cost-efficient operation.
Our DC fast chargers range from 40kW to 240kW. The 40kW-160kW series is optimized for destination and depot charging — workplaces, hotels, shopping centers, and fleet parking — while the 60kW-240kW series extends to higher power for public stations and high-traffic locations.
The chargers offer a wide adjustable output voltage (up to 1000V), supporting both 400V and 800V EV platforms — passenger cars, vans, electric buses, and commercial trucks.
Average efficiency is ≥94% at 50% load and above, with a power factor of ≥0.99, keeping electricity losses and operating costs low for charging station operators.
Yes. Output voltage error, voltage precision, current precision, and ripple factor are all ≤0.5% across the full output range, delivering clean, stable DC that protects vehicle battery health over repeated fast-charging cycles.
Yes. Our chargers use weather-rated enclosures suitable for outdoor commercial installation, with reliable air-cooling designs for stable operation.
Yes — and this is a key Jingye advantage. Because we manufacture both EV chargers and battery energy storage systems, we can deliver integrated storage-plus-charging solutions that reduce grid connection costs and enable fast charging even on sites with limited grid capacity.
Yes. We provide OEM/ODM customization for power configuration, connectors, and communication protocols. Tell us your site type, desired power level, and number of charging points for a tailored recommendation.
Join us and become a customer or partner
We always need your help to expand and develop our business. If you are interested in our products or are interested in becoming our partner, please click the button below and our team will contact you as soon as possible.



Jingye New Energy Testing Laboratory is the core support platform of the company's quality management system. Its CNAS-accredited facility ranks among the industry’s top in total investment, with hardware and technical capabilities both reaching advanced domestic levels.
Equipped with over 100 sets of professional testing equipment, the laboratory features domestically leading key instruments, fully covering critical testing dimensions: physical and chemical analysis, electrochemical performance, safety and reliability, environmental adaptability, and precision dimension and appearance inspection. Among these, the automatic 2D optical measuring instrument—leveraging non-contact optical imaging technology—is widely applied to dimensional control of precision components, significantly improving testing accuracy and efficiency.
In the meantime, the laboratory has built a high-caliber testing team. Focusing on core links of the new energy industry chain, the team has established a full-lifecycle testing service system spanning incoming raw material inspection, in-process component testing, and end-product type testing. It delivers scientific, impartial and accurate technical support for a full range of products including energy storage battery systems, power battery systems and CCS integrated busbars, laying a solid foundation for the company’s product quality improvement and technological innovation.
Jul. 17, 2026
How to Choose a CCS Busbar Supplier: 7 Things to Check
A B2B purchasing checklist detailing the core manufacturing, quality validation, and process technical metrics required when sourcing high-volume CCS integrated busbars.
Jul. 17, 2026
How Much Does a Commercial Energy Storage System Cost?
A realistic guide to evaluating the total cost of ownership for commercial and industrial (C&I) energy storage systems, covering hardware, integration, and engineering factors.
Jul. 17, 2026
Commercial Energy Storage for Steel Plants: The 15MW/30MWh Case Study
A deep technical look at how the Tangshan Huaxi Special Steel 15MW/30MWh liquid-cooled BESS project generated over 300,000 RMB in profit within its first 15 days of grid connection.
Let’s Get Started on Your New Energy Journey.
+86 0311 6736 8615
+86 150 3207 1231