Jiangsu Jingye Iron and Steel 50MW/100.32MWh energy storage power station project
Construction Plan
Jiangsu Jingye Iron and Steel Energy Storage Power Station project system equipment is equipped with 10 sets of 5MW-PCS converter integrated cabins, 20 sets of 5MWh battery prefabricated cabins, 1 set of EMS energy management system, temperature control, and fire protection system, and is operated through two 10kV grid-connected cabinets.
Benefit Analysis
The annual charging and discharging capacity of Jiangsu Jingye Iron and Steel Energy Storage Power Station is not less than 62.8 million kWh, and through time-of-use electricity price management, customer enterprises can achieve an annual share of about 600 yuan.