JINGYE New Energy's Industrial and Commercial Energy Storage Project Helps Enterprises Reduce Costs and Increase Efficiency JINGYE New Energy's Yidelong Trading Industrial and Commercial Energy Storage Project has successfully connected to the grid and achieved safe and stable operation.
Jiangsu Jingye Iron and Steel 50MW/100.32MWh energy storage power station project
Jiangsu Jingye Iron and Steel Energy Storage Power Station project system equipment is equipped with 10 sets of 5MW-PCS converter integrated cabins, 20 sets of 5MWh battery prefabricated cabins
Huaxi Special Steel 15MW/30.09MWh Energy Storage Station
Jingye New Energy designed, funded, built, and operates a 15MW/30.09MWh liquid-cooled battery energy storage station for Huaxi Special Steel — cutting energy costs through peak shaving and valley filling, with two charge–discharge cycles per day and up to 90% system efficiency.