ABOUT US

Home > ABOUT US

About Jingye New Energy

Hebei Jingye New Energy Technology Co., Ltd. ("Jingye New Energy") was established in 2023 as the new-energy arm of Jingye Group. Supporting China's "30·60" dual-carbon goals, we integrate R&D, manufacturing, sales, and O&M of large-capacity battery energy storage systems (BESS), EV battery PACKs, and CCS integrated busbars. Our products serve smart grids, commercial & industrial energy storage, renewable integration, and green transportation, delivering one-stop solutions worldwide with full OEM/ODM customization.

Certifications

Our management systems and products are certified by accredited bodies (CNAS-accredited, CNAS C035-M), covering the design, development, and production of BESS, PACK, and CCS integrated busbars:

  • ISO 9001:2015 (GB/T 19001-2016) Quality Management System — Reg. No. 0350424Q30770R0M, Xingyuan Certification Centre Co., Ltd., valid 31 Dec 2024 – 30 Dec 2027.
  • ISO 14001:2015 (GB/T 24001-2016) Environmental Management System — Reg. No. 0350424E20549R0M, Xingyuan Certification Centre, valid 31 Dec 2024 – 30 Dec 2027.
  • ISO 45001:2018 (GB/T 45001-2020) Occupational Health & Safety Management System — Reg. No. 0350424S30544R0M, Xingyuan Certification Centre, valid 31 Dec 2024 – 30 Dec 2027.
  • IATF 16949:2016 (Edition 1) Automotive Quality Management System (design & manufacture of CCS integrated busbars) — Certificate IATF 0592875, SGS Certificate No. CN25/00008861 (IATF USI: CEMGYX), valid 28 Dec 2025 – 27 Dec 2028.

Company: Hebei Jingye New Energy Technology Co., Ltd. · Unified Social Credit Code 91130185MAD0WTY86D · Registered at 300 meters northeast of Shuike Park (south of Wangfo Road), Luquan District, Shijiazhuang City, Hebei Province, China.

Annual module PACK integration capacity

15 GWh

Annual module PACK integration capacity

CCS busbars produced per year

2.4 million

CCS busbars produced per year

Liquid-cooled containerized energy storage system

5 MWh

Liquid-cooled containerized energy storage system

As part of Jingye Group, Jingye New Energy combines full industrial-chain integration with large-scale automated manufacturing, in-house R&D and testing, and one-stop OEM/ODM service — from requirement communication and solution design through manufacturing, testing, and after-sales support.

  • Full industrial chain: from CCS R&D to lithium module (PACK) production to system integration.
  • Scale manufacturing: 15 GWh/year PACK integration; 2.4 million CCS busbars/year; 5 SMT lines.
  • Proven quality: CNAS-accredited lab, ISO 9001/14001/45001 and IATF 16949 certified.
  • Delivered projects: 50MW/100.32MWh (Jiangsu) and 15MW/30.09MWh (Huaxi Special Steel).
  • OEM/ODM & full lifecycle service.


  •  


 

 

2023.10

Jingye New Energy established under Jingye Group, focused on energy storage R&D, manufacturing, and service.

2024.03

First-phase manufacturing project begins — ~3 billion yuan investment, ~200 mu (13.3 ha) site, with CCS lines, energy-storage-system lines, and SMT lines

2024.11

Independently developed the 5MWh liquid-cooled energy storage system and launched CCS products; obtained ISO three-system certification and advanced IATF 16949; established overseas branches.

2025.02

Secured the 15MW/30.09MWh Huaxi Special Steel energy storage station.

2025.05

Secured the 50MW/100.32MWh user-side energy storage power station in Jiangsu

2023.10

2024.03

2024.11

2025.02

2025.05

Jingye New Energy's testing laboratory is the core platform of our quality system and is CNAS-accredited, ranking among the industry's top in total investment. It houses over 100 sets of professional testing instruments, including a leading automatic 2D optical measuring instrument for high-precision, non-contact dimensional control.

The lab covers every critical dimension — physical and chemical analysis, electrochemical performance, safety and reliability, environmental adaptability, and precision dimension and appearance inspection — across a full-lifecycle system of incoming raw-material inspection, in-process component testing, and end-product type testing for energy storage systems, power battery systems, and CCS busbars.

alt="Full-Process Control"

Full-Process Control

Quality is controlled at three stages: incoming raw-material inspection (vernier calipers, film rulers, 2.5-D withstand-voltage and internal-resistance testing), in-process component testing, and finished-product charge/discharge and liquid-cooling validation.

alt="Testing Equipment"

Testing Equipment

CCD detection, AOI (automated optical inspection), functional testing machines, IR internal-resistance testers, and 2.5-dimensional withstand-voltage testers.

alt="Certified Systems"

Certified Systems

Backed by ISO 9001, ISO 14001, ISO 45001, and IATF 16949 certifications, validated in a CNAS-accredited laboratory.

ESG — Leading a Green Future

Jingye New Energy treats ESG as a core part of its development. Supporting global climate action and China's dual-carbon goals, we advance sustainable manufacturing, workplace safety, and green product design across our energy storage, CCS, and EV-charging lines — contributing to the sustainable development of the new-energy industry.

Our Partners

Let’s Get Started on Your New Energy Journey.

Copyright @Hebei Jingye New Energy Technology Co., Ltd. All Rights Reserved |

+86 0311 6736 8615

+86 150 3207 1231

Cookie Consent

This website uses cookies to improve your browsing experience, analyze site traffic, and understand where our visitors come from. By continuing to use this site, you agree to our use of cookies.